Kerman Methanol Production Plant

امکان سنجی پتروشیمی همت
Hemmat Urea Project Feasibility Study
2020-06-10
Hidaj Methanol Production Plant
2018-03-12
Project Information
Project Name Kerman Methanol Production Plant
Industry Branch Petrochemical
Product(s) & Capacities 450,000 MTPY Methanol
License Petrochemical Research & Technology Co.(NPC-RT)
Client Fajr Kerman Petrochemical Complex
MC
Location Kerman Province
Project Type E
Contract Scope License Arrangement
Basic Engineering  
Front End Engineering Design (FEED)
Detail Engineering
Procurement Services
Equipment & Material Supply
Construction
Pre-commissioning & Commissioning
Construction Supervision
Performance Test
Contract Effective Date 2016.13.06
Contract Duration

8 months from the effective date