The main pre-commissioning activities include the following:
- Pipes Flushing
- Nitrogen purging of the Systems
- Pressure and leakage test
- Testing the strength of electrical and Instrument connections
- Instrument calibration
- Instrument Test loops
- Alignment Testing of pumps and test start (Free run)
- – ….
- Provision of required utilities
- Development of performance test methods
- Supply of consumables and catalysts
- Supply of spare parts
- Provision of necessary tools and equipment
- Defining and identifying the Process systems and subsysems
- Establishment of the ICAPS (Integrated Commissioning and Progress System) system
- Gradual apply of electric power
- Gradual apply of process flow
- Testing the good performance of equipment and systems until reaching the guaranteed performance point
- Making the necessary corrections (if necessary) and repeating the test